| Home | 1992 Index | Search |

| Treatment applied 8/20/85 in effect to 11/1/91 | Current treatment started 11/1/91 |
|---|---|
| Control | Control |
| Quarry lime 6.5 ton CCE/A | Mixed to 6 in. |
| Quarry lime 9.5 ton CCE/A | Mixed to 6 in. |
| Powdered lime 3.25 ton CCE/A | Mixed to 6 in. |
| Powdered lime 4.75 ton CCE/A | Mixed to 6 in. |
| Powdered lime 1000 lb CCE/A | Powdered, annual 1.1 ton/A for 3 years, surface applied |
| Pelletized lime 500 lb CCE/A | Powdered, 3.25 ton/A, surface applied |
| Pelletized lime 1000 lb CCE/A | Quarry lime, 6.5 ton/A, surface applied |